The Building 520 lab supply air shutdown has been scheduled for Saturday, February 12th, from 6:00AM - 10:00AM on all levels in the rooms highlighted in RED, section 1 on the MAP.
Do not occupy the affected areas during this time.
During this time, general building cooling will be affected and temperatures may fluctuate.