The lab supply air for Building 520 will be shutdown according to the schedule below in the rooms highlighted in GREEN (section A) on the MAP.
SCHEDULE:
- Saturday, September 11th, from 6:00AM - 3:30PM
- Sunday, September 12th from 6:00AM - 3:30PM
Do not occupy the affected wet lab areas during this time.
During this time, general building cooling in the designated area will be affected and temperatures may fluctuate.