The NCRC Building 20E/25 Renovation project will require the closure of two sections of corridor commencing at the end of the day on Friday, December 20th.
   
A section of corridor will close on level 1 of Building 10 and access between Building 10 and Building 18 will only be available via the ground floor for approximately 1 month. Please see map for details.
   
A section of corridor on the ground floor of Building 18 will temporarily close and a minor detour will be in effect. Additionally the mail room will be temporarily relocated to Building 10, G062B. Please see map for details. This closure will remain in effect until the project concludes in the Summer of 2020.
   
Detour signage will be in place for both closures.