Parking Structure Entrance Closure

DTE will be installing a utility line as part of the parking structure lighting upgrade on June, 12th, 13th and 14th. The line will run underground from east of Huron Parkway to the west of the NCRC Parking Structure (NC100). DTE will use horizontal directional drilling to run the utility but will need to dig strategic holes to facilitate the drilling.

During the work, the right vehicle entrance lane into the parking structure will be closed along with the adjacent sidewalk. There will also be temporary lane closures on Huron Parkway.

Workers and equipment will be on site while the work takes place.

Please see map to reference locations.