Notifications & Updates

Building 16

On the week of January 29th, one of the Building 16 elevator cabs will be down for two to three days. Once work is complete on the first cab, the other cab will be down for two to three days, until work is completed.

During this time, one elevator cab will be running at all times.


NCRC Building 16 Elevator Replacement Project - Updates

Monday, November 20th and Tuesday, November 21st

Work will take place on both elevators in NCRC Building 16 between 6:00PM and midnight as follows:

  • Monday, November 20th
  • Tuesday, November 21st

During these times both elevators will be unavailable.


Wednesday, November 22nd

A fire alarm test will be conducted in NCRC Building 16 between 6:00AM and 8:00AM on Wednesday, November 22nd. During this time alarms will sound intermittently. There is no need to evacuate the building and further instruction will be given in the event of an actual fire. 

Both elevators will be unavailable between 6:00AM and 8:00AM.


Wednesday, November 29th

Power will be briefly shutdown to the building on Wednesday, November 29th between 6:00AM and 6:30AM for elevator testing. During this time building occupants will experience a single momentary power loss. 
There will also be a fire alarm inspection which will require intermittent ringing of fire alarm between 6:30AM and 8:00AM. There is no need to evacuate the building and further instruction will be given in the event of an actual fire.

Both elevators will be unavailable between 6:00AM and 8:00AM.


Friday, December 8th

Power will be intermittently shutdown to NCRC Building 16 on Friday, December 8th between 9:00AM and 10:00AM for an elevator inspection. Elevator testing will continue throughout the day.

Both elevators will be unavailable between 9:00AM and 5:00PM.


Elevator equipment will be transported from the ground floor to the 4th floor of NCRC Building 16 starting from 5am on Saturday October 28th. The work will take the majority of the day.

There will be noticeable equipment traffic during this time and flooring protection will be placed on the ground and 4th floor lobbies.

The working elevator will remain available for use throughout this work.


On Tuesday, September 5th, the first elevator #50 (on the left) in Building 16 will be complete and both elevators will be in operation through Saturday, September 9th.

Effective Sunday, September 10th, the second elevator #51 (on the right) will not be operational through the end of the project, which is scheduled to be complete in mid-November.


Both of the Building 16 elevators will be shut down between 6:00AM - 7:30AM on Monday, June 19th through Friday, June 23rd.

The stairs will be be open during this time. If stairs are not an option for you, please plan accordingly.

Elevator Replacement

A project to replace the elevators in Building 16 will begin on April 3rd, lasting through September 2017.

During the week of April 3rd, you will notice construction materials being brought into the building during morning hours and around the elevators. This should not impact your walkway. As a safety precaution, barriers will be put in place as needed.

One elevator will remain in service at all times.

Further communications will be sent as needed.